Check of work and replacement of the elastic coupling. BMW the 5th E28/E34 series (from 1981 to 1993 of release)
Repair of BMW E28 and series E34 from 1981 to 1993
1. Cars of the BMW brand of 5-series
2. Engine
3. Cooling system
4. Power supply system
5. Ignition system
6. Control systems of the engine and decrease in toxicity of the fulfilled gases
7. System of production of the fulfilled gases
8. Coupling
9. Manual box of gear shifting (RKPP) and automatic transmission (AT)
10. Transmission line
10.1. General information
10.2. Removal and driveshaft installation
10.3. Check of work and replacement of the elastic coupling
10.4. Check and replacement of the central bearing
10.5. Check and replacement of kardanny hinges
10.6. Check and replacement of a lobby of the centering directing
10.7. Replacement of the hinge of equal angular speeds of the driveshaft
10.8. Removal and installation of power shafts
10.9. Check and replacement of CV JOINTS and their protective covers
10.10. Replacement of lateral epiploons of a case of differential
10.11. Removal and installation of a casing of differential
10.12. Replacement of an epiploon of a gear wheel
11. Steering and suspension bracket
12. Brake system
13. Body
14. Control body sizes
15. Heater and air conditioner
16. System of onboard electric equipment
17. Routine maintenance of the car
18. Size table and adjusting data
19. Schematic electric circuits
20. Governing bodies and operation receptions
21. System of onboard diagnostics - a principle of functioning and codes of malfunctions
 













10-3-proverka-raboty-i-zamena-ehlastichnojj-mufty.html

10.3. Check of work and replacement of the elastic coupling

Check

Though experts of BMW do not stipulate concrete intervals of performance of checks of the elastic coupling located between forward section of the driveshaft and transmission, it it is necessary to examine each time when you work under the car. The coupling is made of rubber and consequently it is susceptible to impacts of blows of road gravel on it, heat developed by system of release, and also to driveshaft twisting. Examine the coupling on existence of cracks, the gaps, the dropped-out fragments and deformations. The worn-out or damaged coupling replace.

Replacement

 PERFORMANCE ORDER

  1. Remove the driveshaft (see. Section Removal and driveshaft installation).
  1. Give nuts and bolts of the elastic coupling and remove the coupling from the driveshaft.

It will be easier to establish bolts on the elastic coupling if to fix it motionlessly by means of a hose piece.


  1. Establish the new coupling with NEW самоконтрящимися nuts. If on the coupling marking in the form of arrows is put, they should be directed to flange levers, instead of to heads of bolts. Tighten nuts with demanded effort.
  1. Establish the driveshaft (see. Section Removal and driveshaft installation).


«on page back
10.2. Removal and driveshaft installation
on page forward»
10.4. Check and replacement of the central bearing